السلام عليكم
mileston
هو نشاط يمثل علامة فارقة فى المشروع مثل انتهاء مرحلة مهمة
اما نشاط الارجوحة فهو كالاتى
A "hammock" task is dependent on external dates for both its start and finish dates and, ultimately, its duration. The name, hammock task, is derived from the way a hammock's shape is determined by the distance between the points to which it is attached.
As scheduled dates in other tasks change, the duration and start and/or finish dates of the hammock task change as well. In other words, given three tasks A, B, and C, task B must start on some date from task A (date A) and task B must finish on some date from task C (date C). For an illustration of this task B, see Example 1.
Back to the top
Example 1--Hammock Task B
A
| C
|-----B-----|
The span of time between dates A and C dictate the available time to accomplish task B. As Date A changes, the start date for task B changes as well; If date C moves, task B must finish appropriately. The difference between dates A and C is the duration for task B. See example 2.
Back to the top
Example 2--Date A Late, Date C Early
A
| C
|--B--|
FLAG
هو يمثل نشاط مهم فى المشروع واى نشاط تريد توضيحة